Trencher Repair & Modification - Bachy

Open pit ground-wall stabilisation • Wear-life improvement

Trencher with modified shoes and carbide teeth

Overview

On a Bachy job forming a stabilised ground wall around an open pit, the trencher's shoes were wearing out rapidly, causing downtime and constant change-outs. After trials with wear blocks and manganese strips, I specified carbide rock teeth and side cutters.

Scope & Methods

  • Failure analysis of shoe wear patterns and operating conditions.
  • Evaluated wear blocks and manganese strip options; documented results.
  • Implemented carbide rock teeth and side cutters; adjusted fit-up.
  • Monitored performance and documented wear-life.

Outcomes

  • ~5x shoe life vs. baseline.
  • Job completed on a single set; eliminated hourly replacements.
  • Reduced downtime and lower consumable cost.